Today is Monday, 6 of September of 2010
   
Homepage
Municipal Solid Waste Processing Plant (CTRSU)
Materials Recovery Facility and Collection Centre (CTE)
Sanitary Landfill (AS)
Biodegradable Waste Processing Plant (ETVO)
Bottom Ash Processing and Recovery Plant (ITVE)
  
valorsul
valorsul
system utilization
system utilization
environmental education
environmental education
projects and initiatives
projects and initiatives
environment and safety
environment and safety
library
library
press kit
press kit
contacts
contacts
 
  
 
Municipal Solid Waste Processing Plant (CTRSU)

The MSW Processing Plant is a special unit that has the capacity to burn out the waste that we do not sort out and simultaneously produce electrical power.



The Plant receives daily approximately 2000 tons of waste and produces enough energy to supply a city of 150 thousand inhabitants.
Technological process:

Mass burning with energy recovery



Localization:

S. João da Talha, municipality of Loures



Occupied area:

4 ha
MSW Source:

Mixed waste collection by the municipalities or private entities



Nominal processing capacity:

662 thousand Mg a year (90% availability)
Products / treatment effluents:



electrical power

bottom ashes

ferrous scrap

flying ashes

flue gases
Date of signature of the Contract:

15th January 1996



Consignation date:

29th November 1996



Construction start-up date:

December 1996
Start-up date of the testing period:

April 1999



Provisory Reception Date:

15th December 1999
 

See also

Combustion
Steam and power production
Flue gases treatment
Combustion products
 


   
Copyright © VALORSUL 2003  
Fotografia: Fotoesfera, lda.  
 
Hiperbit Optimizado para Netscape 6.2 e Internet Explorer 5.5
ou superior, para uma resolução de 800x600 pixels